Summary
- UTA planned upgrades to Salt Lake County transit system in preparation for the 2002 Winter Olympics
- TRAX, the first light rail streetcar system, was implemented running from Draper to downtown Salt Lake
- Front Runner heavy commuter line connects Utah, Salt Lake, and Weber counties
- UTA focuses on reducing pollution with electric buses and plans to convert Front Runner to electric propulsion
- Efforts to shorten Front Runner service interval and expand the line for improved convenience and efficiency
Article
The Utah Transit Authority (UTA) made significant upgrades to the Salt Lake County and Wasatch Front transit systems in preparation for the 2002 Salt Lake City Winter Olympics. The first element of the upgrade was the TRAX light rail streetcar system, which opened in 1999 with a line running from Draper north to downtown Salt Lake City. The second element was the Front Runner heavy commuter line running along the Wasatch Front connecting Utah County with Salt Lake County and Weber County. The Front Runner began service in 2008 and featured 16 stops along its route.
To address pollution concerns in the area, UTA focused on converting its bus fleet to electric buses. By 2024, UTA had 34 all-electric buses operating as part of its 406 full-size bus fleet. These electric buses have zero tailpipe emissions and are extremely efficient, converting electricity into propulsion at an 80% efficiency rate. UTA utilized New Flyer electric buses with overhead pantograph charging systems to fast-charge the buses at designated stops, allowing them to operate all day with a range of 150 miles.
In addition to converting the bus fleet, UTA planned to convert the Front Runner from diesel to electric propulsion to further reduce pollution. UTA considered battery-powered trains as an option for the Front Runner due to challenges posed by freight trains crossing the tracks. UTA partnered with Utah State University and Rocky Mountain Power to develop a plan for using battery-powered trains that could charge while at stops or using short sections of catenary wires. This would contribute to UTA’s efforts in reducing emissions and improving air quality in the region.
To enhance the efficiency and convenience of the Front Runner service, UTA planned to shorten the service interval and extend the line south to Payson and north to Brigham City. Currently, the shortest service interval for the Front Runner is 30 minutes, which can be inconvenient for commuters. UTA aimed to convert many miles of single track to double track along the route to achieve service intervals similar to those found in cities like Vienna, where trains arrive at 4-minute intervals. UTA’s Front Runner Forward program was developed to address these improvements and meet the increased demand for public transit services.
As Salt Lake City was awarded the 2034 Winter Olympic Games, UTA had added motivation to upgrade its transit services over the coming years. By enhancing the efficiency of its electric buses, converting the Front Runner to electric propulsion, and shortening the service interval for commuter trains, UTA aimed to improve public transportation in the region and reduce emissions for a cleaner environment. The partnership with various organizations and ongoing developments in transportation technology showcased UTA’s commitment to sustainability and innovation in the public transit sector.
Read the full article here